Google

Efficient Computing

Data Center Efficiency Measurements

We design each element of our Google data centers to operate at optimal efficiency, from the servers, storage, and networking equipment to facility power and cooling infrastructure. Continuous measurement of power usage by all these elements lets us monitor the health, operating cost, and relative efficiency of our data centers. As we outline below, our approach has led to state-of-the-art efficiency; our efforts have cut our electricity consumption and significantly reduced both our operating costs and environmental footprint. As a result, we believe our data centers are the world's most efficient. 

Such a strong claim demands evidence, especially in light of recent criticism of companies "gaming the numbers." On this page we will explain our measurements in detail to ensure that they are realistic and accurate. It is worth noting that we only show data for facilities with an actual IT load above 5MW, to eliminate any inaccuracies that can occur when measuring small values. This section is aimed at data center experts, but we have tried to make it accessible to a general technical audience as well.

To assess the efficiency of our data centers we use the Power Usage Effectiveness (PUE) metric1. PUE puts a focus on maximizing the power devoted to the equipment running applications and minimizing the power consumed by support functions like cooling and power distribution.  PUE is defined as the ratio of the total power consumed by a data center to the power consumed by the IT equipment that populate the facility:

Power Usage Effectiveness

For example, a PUE of 2.0 indicates that for every watt of IT power, an additional watt is consumed to cool and distribute power to the IT equipment.

We measure PUE in the spirit it was intended and follow its definition strictly.  Our numbers include all power-consuming items in the facility, with one single exception (power used by the office area), and are measured throughout the year and not just during favorable seasons.  Similarly, we count only the servers, storage and networking equipment as IT equipment power. For example, electrical losses in a server's power cord would be counted as overhead, not as IT power. Similarly, we measure total utility power at the utility side of the substation so that losses in substation transformers are included in our PUE. (For more details see the section on measurement methodology further below.) We strongly encourage all data center owners and operators to adhere to Green Grid PUE measurement standards, so we can all drive efficiency forward with meaningful comparisons.

The total data center power consumption is comprised of three major categories: IT power, data center power distribution losses, i.e., losses associated with delivering power to the IT equipment from the electric grid, and the power consumed to operate the data center cooling system.  The intent of the PUE metric is to highlight the fraction of the total data center power consumption devoted to IT equipment.  The ideal PUE value is 1.0, corresponding to a data center where all of the electrical grid power supplied to a data center is devoted to IT equipment and no power is used for cooling and power distribution.  A PUE <1 would be possible with on-site generation from waste heat, but currently this is commercially impractical to implement.

PUE Benchmark Data

Several technical papers have provided estimates and actual measured PUE data for data centers2-4.  In their report to the U.S. Congress5, the US EPA provided a set of efficiency improvement scenarios which predicted future data center energy consumption and associated PUE values to 2011.  The EPA listed four categories of data center efficiency improvements, with increasing cost and complexity, summarized in Table 1.  The report estimates that in 2006, the typical enterprise data center had a PUE of 2.0 or higher.  It is expected that equipment efficiency improvements alone, with current practices, could result in a 2011 PUE of 1.9.  Data centers combining these efficiency gains with better operational practices are expected to reach a PUE of 1.7.  Data centers with advanced efficiency solutions are projected to reach a PUE of 1.3.  Beyond that, the EPA predicted that "state-of-the-art" data centers, employing exotic energy-efficient power and cooling technologies such as liquid cooling and combined heat-and-power energy generation solutions, could reach a PUE of 1.2. We're happy to report that today, on average for all Google designed data centers, we meet the EPA's most optimistic scenario for 2011.

ScenarioPUE
Current Trends1.9
Improved Operations1.7
Best Practices1.3
State-of-the-Art1.2
Figure 1: EPA Estimated PUE Values in 2011 5

Our Results

Figure 1 summarizes the PUE results from all Google-designed data centers with an IT load of at least 5MW and time-in-operation of at least 6 months. The trailing twelve-month (TTM), energy-weighted average PUE for all of these facilities is 1.18, exceeding the EPA's 2011 goal for state-of-the-art data center efficiency. We achieve this result without the use of any exotic techniques the EPA report assumes are necessary to reach this level of efficiency. Individual facilities can return even lower PUE values, with at least one facility returning a TTM PUE of 1.13. Our lowest published quarterly average PUE of an individual facility is 1.10, meaning that all electrical losses and cooling overhead combined used just 10% of the IT load. We believe that each of these data centers ranks among the most efficient data centers currently in operation today.

Why is there variation among the data? Power and cooling architectures differ between facilities, and the facilities themselves are located in different climates, which influences the PUE performance. Also, the data centers shown in Figure 1 were built at various times since 2005, and over time our designs have evolved and become more efficient. For example, Data Center A is the oldest facility of the group and has one of the highest average PUE values. Data Centers E and F are two of the newest and have among the lowest values. In addition, PUE values are impacted by seasonal weather patterns, and thus the PUE during cooler quarters tends to be lower than in warmer ones. Figure 2 plots daily PUE of data center F through commissioning and into operation. The graph shows early amplified day-to-day variations and elevated PUE typical of bring-up activities, and smoothing as it transitions into operation.

Q3 2010 Performance

Quarterly energy-weighted average PUE: 1.20
Trailing twelve-month energy-weighted avg. PUE:  1.18
Individual facility minimum quarterly PUE: 1.12, Data Center J
Individual facility minimum TTM PUE*: 1.13, Data Center B
Individual facility maximum quarterly PUE: 1.24, Data Center A
Individual facility maximum TTM PUE*: 1.21, Data Center H

* Only facilities with at least twelve months of operation are eligible for Individual Facility TTM PUE reporting

Notes:

On average the Q3 wet-bulb temperatures at our facilities were the highest since we have reported PUE. This weather drove an expected QoQ increase in the total quarterly energy-weighted average PUE to 1.20 but the TTM PUE remained flat at 1.18. Even with unfavorable weather our fleet's quarterly performance improved YoY from 1.22 to 1.20 and the TTM performance improved from 1.19 to 1.18. Data Center J's continued operational tuning resulted in a quarterly (and facility) best PUE at 1.12, a strong performance.

Q2 2010 Performance

Quarterly energy-weighted average PUE: 1.17
Trailing twelve-month energy-weighted avg. PUE:  1.18
Individual facility minimum quarterly PUE: 1.13, Data Center J
Individual facility minimum TTM PUE*: 1.13, Data Center B
Individual facility maximum quarterly PUE: 1.22, Data Center A
Individual facility maximum TTM PUE*: 1.23, Data Center H

* Only facilities with at least twelve months of operation are eligible for Individual Facility TTM PUE reporting

Notes:

Typical seasonal effects resulted in a QoQ increase in the total quarterly energy-weighted average PUE to 1.17. On average the Q2 wet-bulb temperatures at our facility locations were higher than those of 2009, yet our fleet's quarterly performance improved YoY from 1.20. For the first time Data Center J posted the best quarterly PUE at 1.13 due to improved operations and tuning. The trailing twelve-month energy-weighted average PUE for all facilities remained at 1.18 an improvement from 1.19 in Q2 2009. Peak summer weather will likely see an increase in the fleet's quarterly energy-weighted average PUE for Q3.

Q1 2010 Performance

Quarterly energy-weighted average PUE: 1.15
Trailing twelve-month energy-weighted avg. PUE:  1.18
Individual facility minimum quarterly PUE: 1.10, Data Center E
Individual facility minimum TTM PUE*: 1.13, Data Center B
Individual facility maximum quarterly PUE: 1.20, Data Center C
Individual facility maximum TTM PUE*: 1.24, Data Center A

* Only facilities with at least twelve months of operation are eligible for Individual Facility TTM PUE reporting

Notes:

Q1 '10 was the best quarterly fleet performance recorded, with the quarterly energy-weighted average PUE of all facilities falling to 1.15 from 1.16 in Q4. All but one facility posted a PUE of 1.2 or less. The improvement was due to the typical seasonal effects and improved operational strategies at Data Centers G, H, I, and J. Data Center E also posted the best quarterly PUE performance from an individual facility to date at 1.10. The trailing twelve-month energy-weighted average PUE improved to 1.18 from 1.19 the same quarter a year ago. We expect higher PUE values in Q2 due to less favorable ambient weather conditions.

Q4 2009 Performance

Quarterly energy-weighted average PUE: 1.16
Trailing twelve-month energy-weighted avg. PUE:  1.19
Individual facility minimum quarterly PUE: 1.11, Data Center E
Individual facility minimum TTM PUE*: 1.13, Data Center B
Individual facility maximum quarterly PUE: 1.21, Data Center C
Individual facility maximum TTM PUE*: 1.21, Data Center A

* Only facilities with at least twelve months of operation are eligible for Individual Facility TTM PUE reporting

Notes:

Seasonal effects and operational improvements enabled QoQ efficiency improvements for all data centers in Q4, reducing the quarterly energy-weighted average PUE of all facilities to 1.16 from 1.22 in Q3. The best quarterly efficiency performance from an individual facility was a PUE of 1.11 (Data Center E), tying our lowest reported value to date (Data Center B, Q1 '09). The trailing twelve-month energy-weighted average PUE improved to 1.19 from 1.20 the same quarter a year ago. The best TTM energy-weighted PUE for an individual facility dropped to 1.13 (Data Center B), the lowest TTM PUE to date. Data Centers G, H, I, and J continue to mature operationally improving their PUE. We expect this trend to continue until they reach the steady state design targets.

Q3 2009 Performance

Quarterly energy-weighted average PUE: 1.22
Trailing twelve-month energy-weighted avg. PUE:  1.19
Individual facility minimum quarterly PUE: 1.15, Data Center B
Individual facility minimum TTM PUE*: 1.14, Data Center B
Individual facility maximum quarterly PUE: 1.33, Data Center H
Individual facility maximum TTM PUE*: 1.21, Data Center A

* Only facilities with at least twelve months of operation are eligible for Individual Facility TTM PUE reporting

Notes:

We added one new facility, Data Center J, to our PUE report. Overall, our fleet QoQ results were as expected. The Q3 total quarterly energy-weighted average PUE of 1.22 was higher than the Q2 result of 1.20 due to expected seasonal effects. The trailing twelve-month energy-weighted average PUE remained constant at 1.19. YoY performance improved from facility tuning and continued application of best practices. The quarterly energy-weighted average PUE improved from 1.23 in Q3'08, and the TTM PUE improved from 1.21. New data centers G, H, I, and J reported elevated PUE results as we continue to tune operations to meet steady-state design targets.

Q2 2009 Performance

Quarterly energy-weighted average PUE: 1.20
Trailing twelve-month energy-weighted avg. PUE:  1.19
Individual facility minimum quarterly PUE: 1.15, Data Center B
Individual facility minimum TTM PUE*: 1.14, Data Center B
Individual facility maximum quarterly PUE: 1.30, Data Center H
Individual facility maximum TTM PUE*: 1.22, Data Center A

* Only facilities with at least twelve months of operation are eligible for Individual Facility TTM PUE reporting

Notes:

This quarter three new data centers (G,H, and I) met inclusion criteria, bringing the total number of conforming facilities to nine. The PUE of the new facilities is elevated due to commissioning and bring-up activities. The combined impact of partially-commissioned facilities and traditional seasonal effects resulted in a QoQ increase of our quarterly energy-weighted average PUE, bringing it to 1.20. The TTM energy-weighted average PUE for all conforming facilities, however, remained at 1.19, despite warmer temperatures. This result is due to continued YoY operational improvements for Google's fully commissioned data centers. Both the minimum and maximum individual facility TTM PUE results decreased in this quarter as a result of operational improvements.

Q1 2009 Performance

Quarterly energy-weighted average PUE: 1.15
Trailing twelve-month energy-weighted avg. PUE:  1.19
Individual facility minimum quarterly PUE: 1.11, Data Center F
Individual facility minimum TTM PUE*: 1.15, Data Center B
Individual facility maximum quarterly PUE: 1.20, Data Center C
Individual facility maximum TTM PUE*: 1.23, Data Center A

* Only facilities with at least twelve months of operation are eligible for Individual Facility TTM PUE reporting

Notes:

The efficiency of all data centers again improved QoQ due to further optimization and cooler temperatures. The quarterly energy-weighted average PUE dropped to 1.15 from 1.16 in Q4, and the quarterly PUE values for each data center was less than or equal to 1.20. The collective TTM energy-weighted average PUE fell to 1.19 from 1.20. The best-performing individual facility quarterly PUE dropped to 1.11 (Data Center F) from 1.13 in Q4 (Data Center E). Data Center F had the highest PUE in Q3'08 due to a low IT load and incomplete commissioning activity at that time. Data Center A yielded YoY reductions due to completed cooling plant improvements. Data Centers C and D improved YoY because of increased IT load, which better utilized the cooling plant resources.

Q4 2008 Performance

Quarterly energy-weighted average PUE: 1.16
Trailing twelve-month energy-weighted avg. PUE:  1.20
Individual facility minimum quarterly PUE: 1.13, Data Center E
Individual facility minimum TTM PUE*: 1.15, Data Center B
Individual facility maximum quarterly PUE: 1.21, Data Center A
Individual facility maximum TTM PUE*: 1.24, Data Center A

* Only facilities with at least twelve months of operation are eligible for Individual Facility TTM PUE reporting

Notes:

Efficiency of all data centers improved QoQ due to continued optimization and cooler temperatures. The quarterly energy-weighted average PUE dropped to 1.16 from 1.22 in Q3 while the collective TTM energy-weighted average PUE fell to 1.20 from 1.21. The best performing individual facility quarterly PUE dropped to 1.13 (Data Centers E, F) from 1.17 in Q3 (Data Center B). All facilities made YoY efficiency improvements, with Data Center A showing strong results from cooling plant improvements designed to improve free cooling.

Data Centers E and F moved through commissioning and into full operation, both yielding an excellent quarterly PUE score of 1.13 and 1.14, respectively. Looking back, Figure 2 shows the large daily variations and higher PUE quieting to an expected lower value. During commissioning, at times all chillers and air movers were run simultaneously in order to test proper operation of the facility. Concurrently, IT equipment load was small because the facility was in the early stages of deployment. These factors caused the higher Q3'08 average PUE values as well as significant day-to-day variations. Q4 '08 saw these commissioning activities taper off, and the favorable seasonal conditions led to lower, stable PUE values.

Q3 2008 Performance

Quarterly energy-weighted average PUE: 1.23
Trailing twelve-month energy-weighted avg. PUE:  1.21
Individual facility minimum quarterly PUE: 1.17, Data Center B
Individual facility minimum TTM PUE*: 1.15, Data Center B
Individual facility maximum quarterly PUE: 1.30, Data Center F
Individual facility maximum TTM PUE*: 1.25, Data Center A

* Only facilities with at least twelve months of operation are eligible for Individual Facility TTM PUE reporting

Notes:

Initial public release of PUE data reported TTM energy-weighted PUE values for six Google data centers satisfying the inclusion criteria. Data centers E & F show the effects of commissioning including large day-to-day PUE fluctuations and are running above the steady-state design efficiency. Seasonal influences can be seen in the Q2-Q3 time frame across all data centers.

Data center PUEFigure 1: PUE data for ten large-scale Google data centers
Average PUEFigure 2: Daily average PUE data for a new Google data center currently in bring-up

Measurement Methodology

The PUE of a data center is not a static value. Varying server and storage utilization, the fraction of design IT power actually in use, environmental conditions, and other variables strongly influence PUE. Thus, we use multiple on-line power meters in our data centers to characterize power consumption and PUE over time. These meters permit detailed power and energy metering of the cooling infrastructure and IT equipment separately, allowing for a very accurate PUE determination.  Our facilities contain dozens or even hundreds of power meters to ensure that all of the power-consuming elements are accounted for in our PUE calculation, in accordance with the metric definition6. Only the office space energy is excluded from our PUE calculations. Figure 3 shows a simplified power distribution schematic for our data centers.

Google data center schematicFigure 3: Google Data Center Power Distribution Schematic

Equation for PUE for Our Data Centers

  • EUS1 Energy consumption for type 1 unit substations feeding the cooling plant, lighting, and some network equipment
  • EUS2 Energy consumption for type 2 unit substations feeding servers, network, storage, and CRACs
  • ETX Medium and high voltage transformer losses
  • EHV High voltage cable losses
  • ELV Low voltage cable losses
  • ECRAC CRAC energy consumption
  • EUPS Energy loss at UPSes which feed servers, network, and storage equipment
  • ENet1 Network room energy fed from type 1 unit substitution

Error Analysis

To ensure our PUE calculations are accurate, we performed an uncertainty analysis using the root sum of the squares (RSS) method.  Our uncertainty analysis shows that the overall uncertainty in the PUE calculations is less than 2% (99.7% confidence interval).  Our power meters are highly accurate (ANSI C12.20 0.2 compliant) so that measurement errors have a negligible impact on overall PUE uncertainty.  The contribution to the overall uncertainty for each term described above is outlined in the table below.

Term Overall Contribution to Uncertainty
EUS14%
EUS29%
ETX10%
ECRAC70%
EUPS<1%
EHV2%
ELV5%
ENet1<1%

Conclusions and Further Work

While we've made a lot of progress when it comes to data center efficiency, we're still learning. As we review our real-time efficiency performance we might, for example, notice that one of our data centers is not performing consistently with others of similar size and locale. So we'll take a closer look at optimizing that facility. Are we using fans to cool spaces that don't need to be cooled? Is the thermostat at the right set-point? Can we reduce the time the chillers need to run while keeping the machines operational? Are there lessons that are applicable from better performing data centers to existing facilities? Using the least amount of power to do the most amount of computing is the right thing to do for both the environment and our bottom line. So far our efficiency efforts have saved hundreds of millions of kWhrs of electricity, cutting our operating expenses by tens of millions of dollars and averting the emission of tens of thousands of tons of CO2.

Please check back for more details and updated PUE data for these data centers and new ones as they come online.

References

[1] The Green Grid, 2007, “The Green Grid Data Center Power Efficiency Metrics: PUE and DCiE,” Technical Committee White Paper.

[2] Malone, C., Belady, C., 2006, “Metrics to Characterize Data Center & IT Equipment Energy Use,” Proceedings of 2006 Digital Power Forum, Richardson, TX.

[3] Greenberg, S., Mills, E., Tschudi, W., Rumsey, P., Myatt, B., 2006, “Best Practices for Data Centers: Lessons Learned from Benchmarking 22 Data Centers,” ACEEE Summer Study on Energy Efficiency in Buildings, http://eetd.lbl.gov/emills/PUBS/PDF/ACEEE-datacenters.pdf.

[4] Accenture and Silicon Valley Leadership Group, 2008, “Data Center Energy Forecast Report,” https://microsite.accenture.com/svlgreport/Documents/pdf/SVLG_Report.pdf.

[5] Environmental Protection Agency, ENERGY STAR Program, 2007, “Report to Congress on Server and Data Energy Efficiency,” http://www.energystar.gov/ia/partners/prod_development/downloads/EPA_Datacenter_Report_Congress_Final1.pdf.

[6] The Green Grid, 2008, “The Green Grid Metrics: Data Center Infrastructure Efficiency (DCiE) Detailed Analysis,” Technical Committee White Paper.

[7] Barroso, L. and Hölzle, U., 2007, “The Case for Energy-Proportional Computing,” IEEE Computer, Vol. 40, No. 12, December 2007.